Asbestos Removal in Georgetown, Texas

At Georgetown Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Empty room with a sealed containment partition and portable air-filtration equipment
Asbestos popcorn ceiling removalAsbestos floor tile and mastic removalAsbestos insulation removalAsbestos siding and roofing removalAsbestos abatement before renovation and demolitionCommercial asbestos abatement

Residential asbestos removal services

Textured popcorn ceiling in a 1970s living room sealed off with plastic sheeting for abatementNine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Asbestos popcorn ceiling removal

Paint, patching compound and the texture itself can each test differently, and many popcorn ceilings have all three after a few decades. We sample every layer your work will touch and let the lab results decide which ceilings come down. The room is then sealed in plastic, the texture wetted and scraped, and the bags hauled away.

Asbestos floor tile and mastic removal

One kitchen can have three different materials underfoot: the tile or sheet vinyl, its felt backing and the black glue below. We sample them one by one. Before we start, we ask your flooring installer what the subfloor needs and settle who handles the repairs and prep.

Insulated heating pipes in a basement mechanical areaIntact gray cement-shingle siding on the exterior of a house

Asbestos insulation removal

Pipe and boiler wrap comes off very differently from loose fill in an attic. Please don't move or poke at either one before it's tested. Once the lab results are in, we map out the way in, any shutdown of the furnace or boiler, and who puts the new insulation back.

Asbestos siding and roofing removal

When hail cracks cement shingles or a re-side is planned, we test the siding or roofing first. We take pieces off whole where they allow it, and we time our work with your siding or roofing crew so walls and openings aren't left open to the weather.

Small older frame house behind a chain-link fence under live oaks, with an empty plastic-lined dumpster at the curb

Asbestos abatement before renovation and demolition

Remodels get a survey of the rooms and surfaces in the plans; teardowns get the whole building. We like to see the plans before anything is torn out. The lab results set the removal order and show whether a state notice applies, and your builder hears from us when the space is theirs.

Commercial asbestos removal projects

Empty commercial room with floor tiles and a containment partition

Commercial asbestos abatement

Commercial jobs are often one suite or floor in a building that stays open. We start by tracing the shared air systems, hallways and neighboring suites the work reaches, then schedule the removal so the building keeps working. The owner, tenants and next trades get records they can use.

Asbestos testing and removal costs

Nearly 1 in every 10 Georgetown homes were built before 1980, so asbestos still turns up in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Georgetown, Jarrell and Florence. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$350 – $700+
  • Whole-house survey before a remodel or demolition$650 – $1,500+
  • Air test after removal (clearance)$300 – $800+
What is included

The inspector takes samples of whatever your project will touch, the lab tests them and a written report comes back. A clear result for a material means it needs no asbestos work. An air check after removal is a second trip, priced on its own line.

Get a free quote

Asbestos popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,200 – $3,500+
  • Several rooms, about 600–1,000 sq ft of ceiling$3,000 – $7,500+
  • Whole house, about 1,200–2,000 sq ft of ceiling$5,500 – $13,000+
What is included

Your painter handles stain primer, skim coat and paint afterward. Before that, the lab confirms the texture, we hang plastic and run a filtered air unit, wet the ceiling and scrape it, then seal the bags, haul them and clean up. A single private house needs no state filing in Texas.

Get a free quoteSee an example projectAbout this service

Asbestos floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$900 – $2,500+
  • Kitchen floor, about 200–300 sq ft$1,500 – $4,000+
  • Several rooms of flooring, about 1,000 sq ft$4,000 – $10,000+
What is included

The flooring and the layer under it tested, plastic at the doorways, tile or sheet vinyl and its backing or black adhesive lifted wet, bagged and hauled, and a clean slab left behind. Tile, wood or vinyl going down afterwards is bought and installed separately.

Get a free quoteSee an example projectAbout this service

Asbestos insulation removal

  • Pipe or duct wrap, up to about 50 ft$600 – $1,800+
  • Furnace or boiler and the pipes or ducts next to it$1,500 – $4,000+
  • Vermiculite insulation in a typical attic$3,500 – $8,000+
What is included

The attic, HVAC closet or crawl space closed off, only the wrap, board or fill the lab flagged taken out damp, every bag sealed and hauled, then a clean-up. Attic work is planned for the cooler hours. New insulation and HVAC work are separate.

Get a free quoteSee an example projectAbout this service

Asbestos siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$1,800 – $4,500+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$9,500 – $18,500+
What is included

Cement shingles or panels wetted and taken off whole where they allow it, broken pieces picked up by hand, all of it wrapped and hauled to an approved landfill. New siding is priced by whoever installs it. If hail or age has hit a cement roof too, that roof gets its own survey first.

Get a free quoteSee an example projectAbout this service

Asbestos removal before a remodel or demolition

  • Kitchen or bathroom remodel, one or two materials$1,500 – $4,500+
  • Whole-house remodel or teardown, several materials$10,000 – $28,000+
  • Whole-house survey before a remodel or demolition$650 – $1,500+
What is included

Removal of the materials that tested positive before the remodel or demolition crew starts, with plastic containment, disposal and cleanup. The inspector’s survey is invoiced by itself. Tearing down a shop or office is filed with the state even when nothing tests positive, while a single house is not.

Get a free quoteSee an example projectAbout this service

Commercial asbestos abatement

  • Survey of a commercial suite or small building$2,000 – $5,000+
  • One office or shop suite, about 1,000–1,500 sq ft$6,000 – $16,000+
What is included

We survey the suite, remove inside a sealed area while the rest of the building stays open, and finish with disposal records and cleanup. The state notice goes in 10 working days ahead, and its fee arrives later as a bill to the owner. After-hours work is extra.

Get a free quoteSee an example projectAbout this service

State notice fee for commercial and public buildings

  • Commercial or public building, about 1,000 sq ft of asbestos$185
  • Commercial or public building, about 5,000 sq ft of asbestos$958
  • Demolition with no asbestos removed$57
What is included

After a job in a commercial or public building, the state sends the owner a bill: $30 for every 160 sq ft of asbestos, at least $55, plus 3%. A demolition with no asbestos pays the minimum. A single private house is neither filed nor billed.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Our process

01

Test what the work will touch

Lab samples come first: we test what the project will disturb and share the results with you and each trade working there.

02

Plan the work area

We settle access, the sealed area, any state notice and the waste plan first; other trades book after that.

03

Hand the room back

Repairs and finishes pass to the next contractor once the room is clean and you have our records and go-ahead.

A survey covers the job it was written for

A limited inspection covers only the rooms and materials it lists. If your remodel grows into a bigger strip-out, or the building is going to be used differently, we look again at whether the survey and our plan still fit before work goes on. Keep the list of tested materials with your drawings, so later contractors can see exactly what was checked.

Texas rules depend on the building

Under Texas DSHS, one private house is handled differently from public buildings and other facilities, and what holds for a single house may not hold for a larger project. Give us the building's use and everything the job includes, and we'll work out which survey and notice apply.

Asbestos removal in Georgetown and nearby communities

We also serve Jarrell and Florence. Call us for confirmation if your address is outside the area.

Frequently asked questions

Can a photograph confirm asbestos?

No. What matters is inside the material, and only a lab test shows it. Anything damaged, or in the path of a remodel, gets sampled by us and sent to the lab.

Does every asbestos-containing material need removal?

Often it can stay. Material in good shape that your work won't touch is usually left alone; if it's damaged or in the way, we'll discuss removal or another fix.

Does removal include new flooring or ceiling finishes?

Usually not. We leave the area clean and the material gone; your flooring crew or painter handles patching and the new finish. We settle that before we start.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (737) 215-4442

Call (737) 215-4442