Coordinate heating and attic access
Tell the assessor what other trades need to do and which systems must stay operational. Ask who handles shutdowns, the conditions for re-entry, and the replacement insulation after removal. Any air testing or clearance requirement should be explained as its own step. A disposal document and an authorization to reuse the room are not interchangeable records.
Match Texas requirements to the building and project
Texas DSHS distinguishes private residences, public buildings and other facilities. Describe the occupancy, use and complete renovation or demolition project before deciding what survey and notification requirements apply. A single-home assumption should not be extended to a larger project without checking.
See the broader asbestos removal options at Georgetown Asbestos Removal.