Asbestos removal in Jarrell

Many Jarrell houses are too new for asbestos, but older ones can still have it in ceiling texture, flooring, insulation or siding. Georgetown Asbestos Removal tests those materials and takes out what comes back positive, in homes and in commercial buildings.

We start by asking what you're changing, what stays, who uses the space and what the next trade needs from us. Those answers set what we sample and the order the work goes in.

Plan this project
Empty room with a sealed containment partition and portable air-filtration equipment

Asbestos removal options

Asbestos popcorn ceiling removal

A water stain, a new light fixture or the wish for a smooth ceiling is usually what puts a popcorn ceiling on the list. We test the texture first, plus any paint, patches or repairs on it, because each can be a different material. The lab result decides which ceilings come down, and a room that was re-textured later gets its own sample. Once the texture is off, the room is ready for drywall repairs and paint, which are a separate job from ours.

Asbestos floor tile and mastic removal

Old floors often have more than one layer: tile or sheet vinyl on top, felt or black mastic underneath, and sometimes a second floor laid over the first. We sample each layer, because the color or size of a tile says nothing about asbestos. Point out where the new flooring is going and any patches or overlays you know of. We then take up only the layers that tested positive, leave the subfloor in place, and settle with your flooring installer who levels and preps it for the new floor.

Asbestos insulation removal

Asbestos insulation can be on a furnace or boiler, the pipes beside it or the ducts in the attic, and each of those is its own job. Please don't move it or pull off a sample yourself. We test pipe runs, elbows and fittings separately, then mark where removal begins and ends and what stays. We schedule attic work for the cooler hours of the day. If a heating or plumbing contractor is replacing equipment, we work out shutdowns and access with them first.

Asbestos siding and roofing removal

Cement shingles and panels can't be judged by eye, so we test them before you cut in a new door or window or replace the siding. If hail has broken pieces off, leave them where they fell until they're tested. Let us know which walls the work covers, if a second layer is hiding underneath, and whether a porch, trim or window changes where we stop. We wet the pieces and lift them off unbroken where we can, and work out with whoever installs the new siding or roof how the wall is protected in the gap between crews.

Asbestos abatement before renovation and demolition

Let us know early if a remodel or teardown is coming. A remodel gets a survey of the rooms and the walls, doorways and layers the plans will cut into; a teardown gets every part of the building surveyed. A kitchen update can leave most of the room alone and still cut through one positive material, so we follow your drawings closely. Once results are in, we set the removal order, check whether a state notice applies and fix a start date with your builder or demolition crew. Anything not in the way stays put.

Commercial asbestos abatement

Commercial jobs often go on beside people who are still working: tenants in the next suite, shared hallways, one air system for the whole building. Give us the full plan for the remodel, not only what the lease describes, and we'll look at the ceilings, floors and partitions it touches. We also check corridors, ductwork and the delivery route, which a room-only list tends to miss, and we plan the work around the building's use. When we're done, the owner, tenants and following trades get the records they need.

One older house or a whole development

Jarrell sits north of Georgetown in Williamson County, and much of its growth has come along Interstate 35. The year a house was built can tell you it's worth testing, but only a lab result shows whether a ceiling, floor or insulation has asbestos in it. The job is built from those results.

If you're remodeling one house, show us the rooms and layers the work will open up. If the plan takes in several buildings or a bigger redevelopment, we need to see all of it, along with who owns each building and how it's used, before we decide which part comes out first.

Getting ready for the work

The whole plan, beyond one room

A room name doesn't tell us much. We need the surfaces you'll cut or remove, anything hidden under later layers and any building besides the house, such as a detached garage or shop. Old reports help, and we'll check what they actually tested against what you plan now. If the drawings change, we look at the new areas before anyone works there.

Access, notices and waste

We set a date once the work area is settled: how we get in and which rooms are off limits during the job. Any state notice, the waste and the repairs afterward each get a named owner. That matters most when the plumber, electrician and builder all hold separate contracts.

Paperwork at the end

Once we're finished, we pass you the paperwork and say when the next trade can start. Ask us which records your job includes: a waste receipt, a visual check, an air test. Each proves something different. If any asbestos stays in the building, we write down where, so later contractors don't disturb it. Keep it all with your house papers for the next remodel.

Texas rules and how the building is used

Before we settle on a survey or a notice, we ask what the building is used for and what the whole remodel or demolition involves. Texas DSHS treats a private home, a public building and other facilities differently.

Property in Florence? Start with asbestos removal in Florence.

Frequently asked questions

Do the rules change when there's more than one building?

They can. A larger renovation or demolition may fall under different rules from one private house, so give us every building and the whole plan, and we'll check what applies.

Can asbestos be spotted by eye?

No. Look-alike materials can test differently, so the eye is no guide. When something is damaged or a project will disturb it, a sample goes to the lab and that settles it.

Must every asbestos material be removed?

Not every one. It depends on how the material is holding up and whether your plans disturb it; sometimes leaving it alone is right, and we'll say what we recommend.

Is the new flooring or ceiling part of the job?

It isn't, unless set beforehand. We leave a clean, bare surface for your flooring crew or painter, and decide who repairs what before we start.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (737) 215-4442

Call (737) 215-4442