Asbestos floor tile and mastic removal in Georgetown

Typical cost in Georgetown

  • One bathroom or laundry floor, up to about 100 sq ft$900 – $2,500+
  • Kitchen floor, about 200–300 sq ft$1,500 – $4,000+
  • Several rooms of flooring, about 1,000 sq ft$4,000 – $10,000+

Before new tile, wood or vinyl goes down, the old floor usually has to come up. In an older house that can mean vinyl tile, sheet vinyl with a felt backing, or black glue. We sample each layer on its own, so you know what has to go.

Jarrell and Florence are inside our service area. If your kitchen, bath or hallway floor is there, send the street address with a rough room list and we'll find a day to come and sample.

Tell us about your project
Nine-inch vinyl floor tiles and black mastic partly exposed in an older kitchen

Tile, mastic and sheet floors we take up

Resilient floor tiles

Nine-inch squares, twelve-inch squares, plain or marbled: no tile pattern answers the asbestos question, only the lab does. We go room by room through the floors you're changing and ask about any patch or second floor laid on top. The plan then lists each tested tile area and the subfloor staying put.

Adhesive and black mastic

Black mastic is tested as its own sample, apart from the tile above it. It can stay stuck to the slab or boards when the tile comes up, and then the next installer has to deal with it.

Sheet flooring and backing

Sheet vinyl from decades back often has a felt layer on its underside, and that felt can test positive when the top doesn't. Cabinets, a wall or a newer floor may be sitting on part of it, so point those out. Our removal follows the edge of your project and any area the demolition newly opens, not whatever line is handy.

Layered floors and transitions

Stacked floors turn up where a kitchen was redone or a room added on: new vinyl over old tile, sometimes over a third layer. We chart each layer's edges, check whether it carries on beneath the cabinets and work out how the finished floors will meet at each doorway, so the tear-out never reaches an untested layer.

The floor we leave behind

Before any tile comes up, you, your flooring installer and we settle what 'done' means. A cleared floor can still be out of level, damp or not ready for the new covering. Leveling, repairs and moisture checks are separate jobs, and each gets a named person. Suspect glue is never ground, sanded or scraped before testing.

Which Texas rules apply to your floor

Your own kitchen floor is one case; the same floor in a shop or a public building may need a survey and a state notice. Texas DSHS writes separate rules for private homes, public buildings and other facilities. Give us the building's use and the rest of the project, and we'll check.

Ceilings, pipe wrap or siding too? We do those jobs as well.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (737) 215-4442

Call (737) 215-4442