Prepare for the exposed building envelope
Removal and replacement may be separate contracts. Ask who is responsible for temporary weather protection, access equipment and the interface with window or roof work. If the scope changes after concealed layers are exposed, stop and have those materials addressed before ordinary construction continues. Do not break off a siding piece merely to identify it.
Match Texas requirements to the building and project
Texas DSHS distinguishes private residences, public buildings and other facilities. Describe the occupancy, use and complete renovation or demolition project before deciding what survey and notification requirements apply. A single-home assumption should not be extended to a larger project without checking.
See the broader asbestos removal options at Georgetown Asbestos Removal.